The following are examples of high-quality dam and civil construction projects recently completed by Hall Earthmoving Pty Ltd, which include several large and high hazard dams.

Swan Valley Irrigation Scheme – Melrose Dam

  • 28.5m dam wall height
  • A capacity of 3,400 megalitres
  • Wall volume 245,000m3
  • Wall length 466m

Charlton Dam

  • Designed and constructed in association with GHD engineers
  • 40m dam wall height
  • Capacity of 10,000 ML
  • Houses a two-stage sand filter
  • Roller Compacted Concrete and rock spillway
  • Works consisted of a downstream raise of an existing dam wall
  • Blasting works for removal of rock in spillway
  • Concrete encased concrete outlet pipe
  • High C hazard rating
  • 130,000 m3 earth volume fill

Woodsprings Dam

  • Designed and constructed in association with Engineering 2 Design
  • 28m dam wall height
  • Capacity of 3500 ML
  • Excavated and rock blasted spillway
  • Single stage sand filter
  • 200,000 m3 earth fill volume
  • High C hazard rating

Tasmanian Irrigation, Floods Creek Dam

  • Designed and constructed in association with GeoTon engineers
  • 18m dam wall height
  • Capacity of 500 ML
  • Spillway excavated and blasted from rock
  • Single stage sand filter
  • Keyway excavation treated with a pressurised grout curtain
  • Concrete encased outlet pipe with floating inlet
  • 45,000 m3 earth fill volume
  • High C hazard rating

Tasmanian Irrigation, Springfield Dam

  • Designed and constructed in association with GHD engineers
  • 25m dam wall height
  • Capacity of 2000 ML
  • Houses a single stage sand filter
  • Concrete spillway and stilling basin
  • High C hazard rating
  • 300,000 m3 earth fill volume

Huon Aquaculture Hatchery, Judbury 2014/2015

  • Designed and constructed in association with Gandy and Roberts
  • Detailed bulk earthworks
  • 14220 m3 fill volume
  • Hardstand and site access works of 10000 m2 area
  • Subgrade access improvement

Tassal Rookwood Hatchery, Ranelagh 2014/2015

  • Designed and constructed in association with Gandy and Roberts
  • Detailed bulk earthworks
  • 12000 m3 fill volume